Temporary meter loop specifications and descriptions. These feeder wires are known as the line wires. Three 3 feet of conductor out of weatherhead. Make note that this is the same type of service that you find on most homes. Meter loop on a free standing structure. Link is external navigation. Co op personnel are not allowed to work on the customer s meter pole or wiring. Staying in the ct circuit we go to the current return terminals. Vec main office 361 573 2428 5502 us hwy 59n. We have two phase wires and a neutral.
The electrical meter is part of a meter loop which also contains a weatherhead and breaker box. Link is external navigation. Three 3 feet of conductor out of weatherhead. Meter loops must be built and installed to specifications set by the power company. Co op personnel are not allowed to work on the customer s meter pole or wiring. Make note that this is the same type of service that you find on most homes. Temporary meter loop specifications and descriptions. Homeowners however can install the meter base. See drawing on the front of this sheet for an example of a typical meter pole. Any unsafe wiring found will not be connected until it has been corrected by the customer.
Staying in the ct circuit we go to the current return terminals. The actual wire connections are quite easy to understand. Wire these backwards and the meter will not register correctly. Going up the diagram from the ct s we have wires x1 and x2 on each ct. Make note that this is the same type of service that you find on most homes. New user link is external or forgot password. Meter loop on a permanent pole single phase 120 240 volts up to 300 amps for complete details see sbec electrical service wiring standards booklet 3. The electrical meter is part of a meter loop which also contains a weatherhead and breaker box. Loop diagrams are the most detailed form of diagrams for a control system and thus it must contain all details omitted by pfds and pids alike. These feeder wires are known as the line wires.
The electrical meter is part of a meter loop which also contains a weatherhead and breaker box. Meter loop wiring diagram. Meter loop must be in emt or rigid conduit. Vec main office 361 573 2428 5502 us hwy 59n. Three 3 feet of conductor out of weatherhead. Underground meter loop service diagram. Meter loops must be built and installed to specifications set by the power company. Wire these backwards and the meter will not register correctly. Meter loop for temporary meter pole for construction. Weatherhead within 3 from top of pole.
Weatherhead within 3 from top of pole. These feeder wires are known as the line wires. Three large gauge stranded wires two hot wires and one neutral enter the meter box from a weather head on a metal mast or from underground service and are attached to the corresponding line terminals on the hot and neutral bus bars in the meter box. Three 3 feet of conductor out of weatherhead. Co op personnel are not allowed to work on the customer s meter pole or wiring. It is also important to note that x1 is connected to the meter socket terminals labeled current in and x2 is connected back to the neutral. Make note that this is the same type of service that you find on most homes. Electric house meters can only be installed by power companies. New user link is external or forgot password. Loop diagrams are the most detailed form of diagrams for a control system and thus it must contain all details omitted by pfds and pids alike.